Northridge Well #15 Equipping & Site Improvements
- Owner
- Fair Oaks Water District
- Engineer
- KASL Consulting Engineers, Inc.
- Engineer’s estimate
- $3M
- Location
- Fair Oaks
- Civil estimating
- Joe Belza
- Electrical estimating
- Jeff Brackenbury
Installation of a multi-stage well pump and 250 horsepower submersible motor capable of delivering not less than 1500 gpm of well water at a total design head of 469.5 feet. The scope includes a concrete well pedestal and well pad, above and below ground piping, valves and fittings, sodium hypochlorite feed system for chlorination, CMU block wall building, site grading, drainage, perimeter CMU block wall, gates, concrete surfacing, hydroseeding and erosion control — plus new pump and motor control panels, lighting, power, instrumentation and controls.