Concept redesign preview for Auburn Constructors — not the company’s official website.
General engineering contractor · Water & wastewater infrastructure · Sacramento since 1990 estimating@auburnconstructors.com (916) 924-0344
Specialty

Treatment facilities.

New headworks, membrane filtration, UV disinfection, aeration and cogeneration — we build and upgrade treatment plants while they stay in service.

What we build
  • Headworks and influent lift stations
  • Secondary treatment and nitrate reduction
  • Membrane filtration and UV disinfection
  • Sludge treatment, solids processing and dewatering
  • Cogeneration fueled with digester gas
Self-performed
  • Structural concrete. Basins, tanks, pump pads, channels and buildings.
  • Underground & aboveground piping. Process, yard and distribution piping.
  • Mechanical equipment installation. Pumps, blowers, UV and treatment equipment.
  • Electrical systems. Power, instrumentation, controls and SCADA.
Start a conversation

Planning treatment plant work? Bring us in early.

How we work

One team, start to finish.

  1. 01

    Collaborate early

    Our collaborative approach integrates the client, design, and construction teams into a unified force.

  2. 02

    Design-assist

    Input on constructability and logistics during design helps prevent costly changes and delays.

  3. 03

    Self-perform

    Our crews self-perform the most critical trades to control schedule and quality.

  4. 04

    Build safely

    Safety is the foundation of everything we do — proven by our results.

  5. 05

    Deliver value

    Maximum quality and value on every project, with lasting partnerships.

FAQs

Specialty FAQs.

Don’t see your question? Call (916) 924-0344.

All FAQs
What treatment work have you built?

Headworks, membrane filtration, UV disinfection, secondary treatment and nitrate reduction, sludge treatment and cogeneration — for Mountain House, Roseville, Jamestown and Regional San.

Do you self-perform electrical on treatment plants?

Yes. On Dry Creek WWTP we self-performed $4.67M of electrical work, and $2.56M on the Jamestown WWTP project.

What is your largest treatment project?

The Mountain House Water Reclamation Facility Phase III Expansion — a $51.7M contract completed in October 2024.

Work with Auburn

Building Northern California’s water future.

Agencies, engineers and developers: bring us in early on your next water or wastewater project. Subcontractors and suppliers: see our bid calendar.