Stormwater & freshwater pump stations.
Booster and transfer pump stations with vertical turbine pumps, CMU buildings, standby generators, and the electrical and instrumentation to run them.
- Vertical turbine booster pumps
- CMU pump buildings
- Flow meter vaults and plant piping
- Standby diesel generators and load banks
- Variable frequency drives and soft starters
- Structural concrete. Basins, tanks, pump pads, channels and buildings.
- Underground & aboveground piping. Process, yard and distribution piping.
- Mechanical equipment installation. Pumps, blowers, UV and treatment equipment.
- Electrical systems. Power, instrumentation, controls and SCADA.
Planning stormwater & freshwater pump stations work? Bring us in early.
One team, start to finish.
- 01
Collaborate early
Our collaborative approach integrates the client, design, and construction teams into a unified force.
- 02
Design-assist
Input on constructability and logistics during design helps prevent costly changes and delays.
- 03
Self-perform
Our crews self-perform the most critical trades to control schedule and quality.
- 04
Build safely
Safety is the foundation of everything we do — proven by our results.
- 05
Deliver value
Maximum quality and value on every project, with lasting partnerships.
What pump station work have you done?
The West Side Tanks and Pump Station Project for the City of Roseville included a booster station with four 250 HP vertical turbine pumps in a CMU building.
Do you install standby power?
Yes — the West Side project included a standby diesel generator with fuel tank and load bank.
Do you handle electrical and instrumentation?
Yes. Electrical systems are one of the four trades we self-perform, including VFDs, soft starters and controls.
Building Northern California’s water future.
Agencies, engineers and developers: bring us in early on your next water or wastewater project. Subcontractors and suppliers: see our bid calendar.