West Side Tanks and Pump Station Project
City of Roseville · Roseville, CA
Scope of work
Construction of two 6.0 MG pre-stressed concrete water storage tanks; a new booster pump station including four 250 HP vertical turbine pumps housed in a CMU building; flow meter vault; plant piping; new standby diesel generator with fuel tank and load bank; sitework including sewer, storm drain and potable water tie-ins; electrical and instrumentation including variable frequency drives, reduced voltage soft starters, security equipment, and new transformer.
Contract milestones
- May 2020Commencement
- May 2022Substantial completion
- August 2022Original completion
- March 2023Final completion