Storage & pump station

West Side Tanks and Pump Station Project

City of Roseville · Roseville, CA

Owner
City of Roseville
Contract
$24,885,734
Completed
March 2023
Location
Roseville, CA

Scope of work

Construction of two 6.0 MG pre-stressed concrete water storage tanks; a new booster pump station including four 250 HP vertical turbine pumps housed in a CMU building; flow meter vault; plant piping; new standby diesel generator with fuel tank and load bank; sitework including sewer, storm drain and potable water tie-ins; electrical and instrumentation including variable frequency drives, reduced voltage soft starters, security equipment, and new transformer.

Contract milestones

  1. May 2020Commencement
  2. May 2022Substantial completion
  3. August 2022Original completion
  4. March 2023Final completion
Start a conversation

Planning a project like this for your agency? Bring us in early.

Work with Auburn

Building Northern California’s water future.

Agencies, engineers and developers: bring us in early on your next water or wastewater project. Subcontractors and suppliers: see our bid calendar.