Concept redesign preview for Auburn Constructors — not the company’s official website.
General engineering contractor · Water & wastewater infrastructure · Sacramento since 1990 estimating@auburnconstructors.com (916) 924-0344
Bid date · 11/13/2026 – 2 PM

Northridge Well #15 Equipping & Site Improvements

Fair Oaks Water District · Fair Oaks

Owner
Fair Oaks Water District
Estimate
$3M
Bid date
11/13/2026 – 2 PM
Location
Fair Oaks

Scope of work

Installation of a multi-stage well pump and 250 horsepower submersible motor capable of delivering not less than 1500 gpm of well water at a total design head of 469.5 feet. The scope includes a concrete well pedestal and well pad, above and below ground piping, valves and fittings, sodium hypochlorite feed system for chlorination, CMU block wall building, site grading, drainage, perimeter CMU block wall, gates, concrete surfacing, hydroseeding and erosion control — plus new pump and motor control panels, lighting, power, instrumentation and controls.

Subcontractors & suppliers

See what we’re bidding now — owners, estimates, bid dates and estimators.

Why Auburn

Why agencies build with us.

01

Water since 1990

More than 35 years building Northern California’s water infrastructure — water is our sole focus.

02

Four trades in-house

Our crews self-perform structural concrete, piping, mechanical equipment installation and electrical systems.

03

Proven safety

A five-year average EMR below 0.80, zero OSHA citations and a drug-free workplace.

04

Crews who stay

A merit shop with craftspeople who have been here 10, 20 and even 30 years — trained with WECA and ABC.

Work with Auburn

Building Northern California’s water future.

Agencies, engineers and developers: bring us in early on your next water or wastewater project. Subcontractors and suppliers: see our bid calendar.