Northridge Well #15 Equipping & Site Improvements
Fair Oaks Water District · Fair Oaks
Scope of work
Installation of a multi-stage well pump and 250 horsepower submersible motor capable of delivering not less than 1500 gpm of well water at a total design head of 469.5 feet. The scope includes a concrete well pedestal and well pad, above and below ground piping, valves and fittings, sodium hypochlorite feed system for chlorination, CMU block wall building, site grading, drainage, perimeter CMU block wall, gates, concrete surfacing, hydroseeding and erosion control — plus new pump and motor control panels, lighting, power, instrumentation and controls.
See what we’re bidding now — owners, estimates, bid dates and estimators.
Why agencies build with us.
Water since 1990
More than 35 years building Northern California’s water infrastructure — water is our sole focus.
Four trades in-house
Our crews self-perform structural concrete, piping, mechanical equipment installation and electrical systems.
Proven safety
A five-year average EMR below 0.80, zero OSHA citations and a drug-free workplace.
Crews who stay
A merit shop with craftspeople who have been here 10, 20 and even 30 years — trained with WECA and ABC.
Building Northern California’s water future.
Agencies, engineers and developers: bring us in early on your next water or wastewater project. Subcontractors and suppliers: see our bid calendar.



